Home About Us History  Portfolio Services Newsletters Site Map Contact Us
Fossil Ridge Intermediate School
 
Scott M. Matheson Courts Complex
Salt Lake City, Utah
 

VBFA was responsible for the mechanical and civil engineering for this major courts facility with three levels of underground parking and prisoner holding area. The delivery method was Design Build.

One of the unique features of this 418,000 square foot courts facility is that the mechanical system is located on the roof of the building. This minimizes the risk of tampering with the system. The mechanical system also uses a state-of-the-art variable volume reheat system with constant volume distribution with each courtroom to maintain ventilation standards.

VBFA also provided complete civil engineering services for the facility, including building utilities, storm drainage, and grading design of ramps into three levels of underground parking. The civil work also included design of a permanent foundation dewatering system.

Scott M. Matheson Courts Complex

 

 
HOME | ABOUT US | HISTORY | PORTFOLIO | SERVICES | TEAM | AWARDS | CAREERS | PROJECTS | VBFA INTRANET | CONTACT US | SITE MAP

Corporate Office: 330 South 300 East, Salt Lake City, Utah 84111; Phone: (801) 530-3148, Fax: (801) 530-3150
  Copyright © 2008 vbfa.com. All rights reserved.  
Website Powered by  IS&T™