These projects included improvements for both terminals: more screening lanes, better queue space, more arrival area and improved circulation as well as remodel of restrooms in screening area and remodel of ticket counters. The project included new offices for Delta and other airlines.
PreConditioned Air Units Study
This project was a study of HVAC preconditioned HVAC units at each Jetway and the Central Plant that serves a majority of those units. The report included the condition of existing equipment including the cost to repair or replace equipment.
Airport Mechanical Study FY03
An overall mechanical systems study of Terminal 1, Terminal 2, the Central Plant and Concourses A, B, C and D. This study also included an analysis of the hot water and chilled water piping systems.
Locker Room Expansion North Supports
This project consisted of the addition of a new locker room to North Supports / Electrical Building North of the airport. This included ventilation |
|