Fossil Ridge Intermediate School
 
Salt Lake City International Airport Open-End
Salt Lake City, Utah
 
HVAC Upgrades to Terminals 1 and 2; Terminal 2 EDS Addition
These projects included improvements for both terminals: more screening lanes, better queue space, more arrival area and improved circulation as well as remodel of restrooms in screening area and remodel of ticket counters. The project included new offices for Delta and other airlines.

PreConditioned Air Units Study
This project was a study of HVAC preconditioned HVAC units at each Jetway and the Central Plant that serves a majority of those units. The report included the condition of existing equipment including the cost to repair or replace equipment.

Airport Mechanical Study FY03
An overall mechanical systems study of Terminal 1, Terminal 2, the Central Plant and Concourses A, B, C and D. This study also included an analysis of the hot water and chilled water piping systems.

Locker Room Expansion North Supports
This project consisted of the addition of a new locker room to North Supports / Electrical Building North of the airport. This included ventilation
Salt Lake City International Airport Open-End

and revising of existing heating and cooling system to accommodate remodel.

Concessions Plumbing Remodel
A study of existing pipes was prepared, identifying the cause of waste pipe failure. Following the study, all cast-iron waste piping in the Concessions Areas was replaced with stainless steel waste piping.

 
 
HOME | ABOUT US | HISTORY | PORTFOLIO | SERVICES | TEAM | AWARDS | CAREERS | PROJECTS | VBFA INTRANET | CONTACT US | SITE MAP

Corporate Office: 330 South 300 East, Salt Lake City, Utah 84111; Phone: (801) 530-3148, Fax: (801) 530-3150
  Copyright © 2008 vbfa.com. All rights reserved.  
Website Powered by  IS&T™