VBFA provided mechanical engineering services for this $1.3 million recreation center and pool. The project included a gymnasium, locker rooms and offices. The 90,000 gallon pool has a zero-depth entry, to be handicap accessible, and stairs. The filtration is hi-rate rapid sand, and the treatment is designed for state-of-the-art ozone water treatment. |
|